The seven lines
- Formula / bulk. Raw materials plus batching time. For a sheet mask this is the essence; for a serum it is the whole product. Rich actives and high inclusion rates move this line quickly.
- Primary pack. Bottle, jar, tube, pouch or film. Usually the largest single line in a sheet mask and a major one in a serum.
- Secondary pack. Carton, leaflet, shrink wrap, case. Cheap per unit, expensive in minimum order terms.
- Filling and assembly. Line time, labour, and the setup you pay for whether the run is long or short.
- Testing. Stability, microbiological and preservative efficacy testing. A fixed cost per formula, which is why adding a second formula costs more than adding a second size.
- Documentation. Safety assessment, certificates of analysis, GMP evidence, artwork checks. Small in cash, large in lead time.
- Freight and duties. Often missing from the quotation you compare, and often the reason the cheapest quote is not the cheapest product.
Where the unit price actually moves
Buyers assume the formula is the expensive part. In sheet masks it usually is not: the film and the printed pouch together frequently outweigh the essence. In serums the bottle, the pump and the carton can rival the bulk. If you want a lower unit price, the pack is usually the faster lever than the formula — and it is the lever that does not change what the customer experiences on the skin.
What scale genuinely saves: material purchasing, line setup, and print runs. What scale does not save: stability testing per formula (fixed), artwork (fixed), and freight per kilogram (only slightly).
Indicative share of cost, with a caveat
| Line | Sheet mask | Serum |
|---|---|---|
| Bulk / essence | Moderate | Moderate to high |
| Primary pack | High | High |
| Secondary pack | Low to moderate | Low to moderate |
| Filling | Low | Low to moderate |
| Testing and documents | Fixed per formula | Fixed per formula |
These are shapes, not quotes. Any real figure depends on inclusion rate, pack weight, order volume and destination — ask for a line-by-line quotation rather than a single unit price, and compare like with like.
Hidden costs that appear after the deposit
- Tooling. Moulds, print cylinders and dies are one-off and sometimes invoiced separately.
- Artwork and proofing. Colour proofing on a printed film is not free and is not always in the quote.
- Overruns. Many runs deliver slightly above or below the ordered quantity within an agreed tolerance. Budget for the upper end.
- Dead stock. If the minimum is 3,000 and you sell 900 in the first quarter, the rest is inventory you are storing and insuring.
- Compliance work in the destination market. Responsible Person fees, notification fees and local testing are rarely in a factory quotation.
Ex-works, FOB or landed
Three quotations that look comparable often are not. Ex-works means you collect from the factory gate; FOB means the goods are cleared and loaded at the port; landed means delivered with duties paid. Always convert to landed cost before comparing, including the freight class, the Incoterm and who pays for inspection.
A supplier who will quote landed cost is usually a supplier who has shipped before. A supplier who will only quote ex-works and cannot explain the freight is asking you to carry a risk you cannot yet price.
How to negotiate without damaging the product
Do not start with the formula. Start with the pack, the run length and the release schedule. Moving from a printed bottle to a stock bottle with a label, or from three SKUs to one, changes the cost structure without touching the thing your customer puts on their face. Then ask what a twelve-month forecast with scheduled releases would do to the price — a factory that buys material once against a schedule can usually do better than one quoting a single small order.
Questions buyers ask
What is the biggest cost in a private label sheet mask?
Usually the film and the printed pouch, not the essence. That is why changing the pack format often lowers the unit price faster than reformulating.
Why do two suppliers quote very different prices for the same brief?
Almost always a different pack, a different run length, or a different Incoterm. Ask for a line-by-line quotation and convert both to landed cost before comparing.
Should I pay for a custom mould on a first order?
Only if the shape is a core part of the brand. A stock pack with printed artwork gets you to market faster and leaves the budget for testing and marketing, and it can be replaced by a custom mould on the second order once volumes are known.
Have a specific project in mind?
Send the target market, product type and estimated quantity — we reply with a feasibility plan and sampling options.
Get a Quote